Energis Power Corporation is setting up a high efficiency cogeneration power plant to supply electricity to PDB. Powered by 6 MAN B&W 9L 58/64 HFO engines and two Hangzhou steam turbines with combined installed capacity of 73.8 MWe, the 55 MW at-grid capacity power project will be the most efficient HFO power generation plant in the country.